With rising demand of wind power, there’s also an increased need for wind turbine installation vessels. Thanks to advanced specification new windfarm installation vessels are designed to operate in challenging conditions with high-quality equipment and experienced crew.
With emissions regulations new vessel must meet the environmental demands with lower emission impact, increase the fuel efficiency and optimize power output with power system. With EES integration from Corvus Energy the offshore vessels will become more effective for fuel conservation and emission reduction.
Vessels in this segment are:
- WTIV Jack-Up (Wind Turbine Installation Vessel) (ISV)
- WTIV Semi-submersible
- WTIV Ship Shaped
- FIV/Piling vessel (FIV, Installation Vessel)
- CSOV (Construction Service Operation Vessel)