70-100 m
500-1000 kWh
This project follows the successful sea trial of Harvey Energy, the first-ever LNG-battery hybrid retrofit of a platform supply vessel (PSV) in the Americas. Harvey Gulf CEO, Shane Guidry has reported that clients and investors are increasingly demanding energy efficiency and emissions reduction. The four LNG-battery hybrid vessels Harvey Liberty, Harvey Power, Harvey Freedom and Harvey America will be fitted with the 1100VDC – 745 kWh ESSs in 2021 and are expected to go into service in early 2022.
Name | Harvey Power |
Owner | Harvey Gulf |
Integrator | Wärtsliä |
Segment | Offshore Oil & Gas |
Sub-segment | Offshore support vessels |
Vessel type | PSV |
ESS capacity | 746 kWh |
Corvus product | Corvus Orca ESS |
Delivery year | 2021 |
Newbuild/Retrofit | Retrofit |
Vessel size | 92,05 m x 19,51 m |
Gross tonnage | 4458 t |
Deadweight tonnage | 5397 t |
IMO no | 9654232 |
Area of Operation | USA |
Ship system | Hybrid |
Bus Voltage | 800-1100 VDC |
Class | ABS |
Flag state | USA |
Estimated annual savings
diesel/year saved
CO2 emission reduction
Battery operation
Load Levelling
Peak Shaving
Spinning Reserve